High-level workflow for large-scale building simulation with AutoBEM: The bottom part of the workflow represents the overall workflow while the top portion provides more detail …
An overview of the methodology presented in this paper, guided by the data workflow. The left-hand side of the figure, (a)-(d), illustrates the traffic data workflow: the data is …
Comparison of annual electricity savings for different vintages (color) and energy conservation measures.
Left: The traffic simulation area (yellow) within the Chicago area (red). Middle: Simulated buildings in the Chicago Loop (blue). Right: 3D rendering of buildings in the Chicago …